New Zealand already requires consideration of whole-of-life cost when making public investment commitment decisions. The weakness is that this discipline drops off during design, procurement and value engineering, when pressure returns to reducing the immediate capital cost.

This risks delivering the lowest-cost project today, rather than the best-value public asset over its life.


Recommendation


Require significant Crown building investments to maintain a live whole-of-life cost model, similar to the UK Government’s “Should Cost Model”, from business case, through procurement, construction, and operation.

Material tender and value-engineering decisions should be assessed against their impact on:

• capital cost;

• energy and maintenance;

• component renewal and replacement;

• operational disruption; and

• total risk-adjusted whole-of-life cost.


Where a higher initial investment demonstrably produces materially lower whole-of-life cost, that advantage should be capable of determining tender selection, subject to required quality and service outcomes.


Why it matters


A $3 million capital saving is not a saving to the Crown if it creates $6 million of additional maintenance, energy and replacement costs.

The UK has moved towards this approach through its "Should Cost Modelling" regime, which carries whole-life costing into procurement and permits its use in formal bid evaluation. New Zealand can Adopt this model and take it to the next step, by making whole-of-life value consequential in procurement decisions.


Procurement Policy Application


Objective: To buy the public asset that provides the best long-term value to the Crown, not simply the one that costs least to construct. Practical application is highly relevant to design build contruction procurement. To deliver best long-term value, the design build procurement outcome must be determined principally on the special non-price-attribute, of whole-of-life costs, transparently determined by robust cost modelling using a specialist construction cost consultant. Current Government procurement guidelines lead us to pursue the best public value outcomes that whole-of-life costing unimpeachably demostrates full compliance with.






“If you enjoy this blog, please share it with your like minded colleagues”


“Celebrating 50 years of New Zealand Building Economist 1972 to 2021”


By Matthew Ensoll

Life Member NZIQS. Reg.QS.

Editor New Zealand Building Economist.



 
 
 