Entitlement to Time-related Costs, when an EoT is not granted
If you are slow in notifying a claim for an Extension of Time, [1] it’s potentially a bad situation, but all is not lost. A Contractor...

The NZ Building Economist
Mar 2, 2025


Advance Notice (Early Warning) Default by the Principal
Since 2013, NZS3910 has made 5.21 Advance Notice or 6.10 Early Warning, popular for judging whether a ‘material’ Variation or Extension...

The NZ Building Economist
Feb 7, 2025


Show me your contract
To ensure fair resolution of claims emanating from subcontractors, the Head Contractor must be transparent with the Principal about...

The NZ Building Economist
Nov 14, 2021